Project Overview
Kampung jawa
41000 Klang
Selangor, Malaysia +6016626xxxx +6035161xxxx
Kg. Chempaka
47301 Petaling Jaya
Selangor, Malaysia
Interior Design Project Info
Phase 1 - Drawing Submission for local authority approval
Phase 2 - Civil, MNE works
A) Ground floor & external Area
- Civil work demolish & install new bricks wall
- Demolish & install new tiles X 7 rooms, walkway, reception, office area, toilet
- Roller Shutter
- Gypsum board partition & door installation X 7 rooms
- Install cubical washroom for Male and Female
- Plaster Ceiling installation
- Epoxy Flooring
- Remove and install staircase with steel work
- M&E work for power point X 120 units
- Network & comm line point X 16 units
- Wiring supply and installation for genset
- Supply & install signage for intercity logo with LED
B) First Floor
- Civil work demolish & install new door X 10 units
- Demolish & install new tiles X 10 rooms, walkway, office area, toilet
- Gypsum board partition & door installation X 10 rooms
- Install cubical washroom for Male and Female
- Plaster Ceiling installation
- Epoxy Flooring
- Remove and install staircase with steel work
- M&E work for power point X 103 units
- Network & comm line point X 49 units
- Wiring supply and installation for genset
- Supply & install signage for intercity logo with LED
C) Second Floor
- Civil work demolish & install new door X 3 units
- Demolish & install new tiles X 3 rooms, walkway, office area, toilet
- Gypsum board partition & door installation X 3 rooms
- Install cubical washroom for Male and Female
- Plaster Ceiling installation
- Epoxy Flooring
- M&E work for power point X 43 units
- Network & comm line point X 22 units
D) Fire Protection Work
- Smoke Detector X 106 units
- Emergency LEF Light X 52 units
- Bomba emergency Bell X 3 Units
- Unique Break Glass tools X 4 units
- Exit Sign X 9 units
E) Card access System
- Install security reader X 6 sets
- Install security doors X 5 sets
- Install card access internal looping cable for controller reader x 11 sets
- Install RS 485 cable for card access controller unit to workstation x 11 sets
- Training session
- Testing and re-program system
F) Key Phone System
- Smart key phone system
- Dinstar FXO gateway
- Grandsteam IP Phone
- installation, testing and program
G) IT System
- Jetstream 24-ports
H) CCTV System
- CCTV point - 25 units
- 10 TB HHD CCTV Series - 4 nos
- 55" monitor - 2 units
- Buller 1P camera - 25 units
- HDMI cable 20 meters X 2 units
I) Air-conditioning System
- 1.0 hp X 5 units
- 1.5 hp x 1 unit
- 2.5 hp x 7 units
- 3.0 hp x 3 units
- 5.0 hp x 5 units
Phase 3 - Furniture
- Office Chair
- Meeting Table
- Panel White Board
- Canteen Round table
- Dining Low back Chair
- Cafe High Bench table
- Cafe High "L" bench table
- Production/visitor locker
- workstation table
- Mobile pedestal
- Low Cabinet Swing Door
- Open Plan Partition
- Side Cabinet Locker
Phase 4 - Warehouse & Store