Project Overview

Interior Design Budget
RM 1,343,991
Duration
24 weeks
Completion Year
2024
Save This Project
Headquarter and Showroom No. 15, Lot 10517, Jalan Sg. Jati,
Kampung jawa
41000 Klang
Selangor, Malaysia
+6016626xxxx +6035161xxxx
Branch Office No. 303, PJU 1/38,
Kg. Chempaka
47301 Petaling Jaya
Selangor, Malaysia
Request Quote
Trusted
Verified

Interior Design Project Info

Phase 1 - Drawing Submission for local authority approval
Phase 2 - Civil, MNE works
A) Ground floor & external Area
- Civil work demolish & install new bricks wall
- Demolish & install new tiles X 7 rooms, walkway, reception, office area, toilet
- Roller Shutter
- Gypsum board partition & door installation X 7 rooms
- Install cubical washroom for Male and Female
- Plaster Ceiling installation
- Epoxy Flooring
- Remove and install staircase with steel work
- M&E work for power point X 120 units
- Network & comm line point X 16 units
- Wiring supply and installation for genset
- Supply & install signage for intercity logo with LED
B) First Floor
- Civil work demolish & install new door X 10 units
- Demolish & install new tiles X 10 rooms, walkway, office area, toilet
- Gypsum board partition & door installation X 10 rooms
- Install cubical washroom for Male and Female
- Plaster Ceiling installation
- Epoxy Flooring
- Remove and install staircase with steel work
- M&E work for power point X 103 units
- Network & comm line point X 49 units
- Wiring supply and installation for genset
- Supply & install signage for intercity logo with LED
C) Second Floor
- Civil work demolish & install new door X 3 units
- Demolish & install new tiles X 3 rooms, walkway, office area, toilet
- Gypsum board partition & door installation X 3 rooms
- Install cubical washroom for Male and Female
- Plaster Ceiling installation
- Epoxy Flooring
- M&E work for power point X 43 units
- Network & comm line point X 22 units
D) Fire Protection Work
- Smoke Detector X 106 units
- Emergency LEF Light X 52 units
- Bomba emergency Bell X 3 Units
- Unique Break Glass tools X 4 units
- Exit Sign X 9 units
E) Card access System
- Install security reader X 6 sets
- Install security doors X 5 sets
- Install card access internal looping cable for controller reader x 11 sets
- Install RS 485 cable for card access controller unit to workstation x 11 sets
- Training session
- Testing and re-program system
F) Key Phone System
- Smart key phone system
- Dinstar FXO gateway
- Grandsteam IP Phone
- installation, testing and program
G) IT System
- Jetstream 24-ports
H) CCTV System
- CCTV point - 25 units
- 10 TB HHD CCTV Series - 4 nos
- 55" monitor - 2 units
- Buller 1P camera - 25 units
- HDMI cable 20 meters X 2 units
I) Air-conditioning System
- 1.0 hp X 5 units
- 1.5 hp x 1 unit
- 2.5 hp x 7 units
- 3.0 hp x 3 units
- 5.0 hp x 5 units
Phase 3 - Furniture
- Office Chair
- Meeting Table
- Panel White Board
- Canteen Round table
- Dining Low back Chair
- Cafe High Bench table
- Cafe High "L" bench table
- Production/visitor locker
- workstation table
- Mobile pedestal
- Low Cabinet Swing Door
- Open Plan Partition
- Side Cabinet Locker
Phase 4 - Warehouse & Store


Interior Design Works Included


Interior Design Project Areas